1. Click Manufacturing Control>Bill of Materials>Production Entry.
2. Specify the number of the ticket (1-999999), the item number or finished item number. After you specify an ticket or item, the MC Side Bar is available from the entry grid to display additional information for component items.
3. In the Whse field, specify the warehouse to produce the finished item (i.e., all component items will come from this warehouse).
4. In the Entered field, specify the date of the production entry.
5. In the Production field, specify the planned production date, i.e., date production is scheduled to take place.
6. In the Priority drop box, specify the Priority order priority to use: N-normal, R-rush and/or H-service hold BOM tickets.
7. In the Units field, specify the number of units to produce.
8. Press F2to display production planning for the finished item being specified.
9. The on-order quantities are updated for the warehouse for the BOM finished item, and the program automatically displays the required component line-items. The units required of the component items are calculated based on the number of finished units specified in the header. Once the component line-items are added, the committed quantities are updated in the warehouse for those component items. On hand, on order, committed quantities and the stocking units of measure are displayed in the line-item section of the screen.
10.(Optional) You can perform a number of functions:
Change a line-item
Add line-items
Insert line-items
Delete line-items
Stop line-item entry
Access Note Entry (SME710) for the item highlighted in BOM line item browser or for the BOM document line record highlighted in the line item browser.
Done Ends Bill of Materials Entry and returns you to the Finished Item field. Press Done again to exit the program .
11. (Optional)To change or delete any finished items from production tickets, complete steps 12-15:
12. Highlight the line number you want to delete or change.
13. Click Delete or Edit.
14. If you click Edit, the system accesses the Units field, so you change the quantity to produce. Click Save.
15. (Optional) To add finished items to production tickets, complete steps 16-20:
16. Specify the planned production date. Press Enter to default to the system date.
17. Specify the component item number to be used to produce the bill of material finished item. The entry must be a valid number. Valid entries display the item description and stocking unit of measure.
18. Specify the number of units needed to produce one finished item.
19. Specify the quantity planned to produce.
20. (Optional) Specify the memo for the component item to appear on the production tickets (up to 20 characters).
21. Click Save.
22. Click Done.
23. Check the Print build ticket now check box and click OK to print the ticket.