| W-Warehouse Quantities | 
                    Displays the warehouse quantities for that selected line. All warehouse’s quantities for a selected item on the BOM are displayed. This is item-specific, and contents change with items on the BOM. | 
                      | 
                    There is no further action in this view. | 
                
                
                    | s-Substitute Items | 
                    Displays substitute items for the selected item. The item description, quantity and buying UM are also displayed. Note: Only substitute items that are BOM defined items are displayed. | 
                    X  When a drag and drop line is created, the warehouse for the currently selected line of the planned order is used. | 
                    Double click a substitute item to launch the Change Substitute Item Quantity window for the selected substitute item. | 
                
                
                    | N-Notes | 
                    Displays notes based on BOM and item. This is BOM-specific and item-specific. The contents related to the BOM will not change, but content may change with item selection. | 
                      | 
                    Select a note and double-click to launch the Note Entry (SME710) for the line and type: BOM or Document (header); Line or Item (line). | 
                
                
                    | O-Open Tickets | 
                    Displays the selected item’s current open production tickets for that single item. This is item-specific, and contents change with item selection.  | 
                      | 
                    Double click a line to launch the Production view of Bill of Materials Inquiry (MCI610) for the line selected. | 
                
                
                    | P-Past Tickets | 
                    Displays the selected item’s current past production tickets for that single item. This is item-specific, and contents change with item selection.  | 
                      | 
                    Double click a line to launch the Past Production view of Bill of Materials Inquiry (MCI620) for the line selected. | 
                
                
                    | p-Past Planned Production | 
                    Displays the selected item’s past planned production tickets for that single item. This is item-specific and contents change with item selection.  | 
                      | 
                    Double click a line to launch the Past Planned view of Bill of Materials Inquiry (MCI620) for the line selected. |